Project facts:
  • Client:Unite Federation
  • Location:Luton
  • Size of Project:3600ft2
  • Budget:£110,000
Due to their existing premises being somewhat old & tired, and the costs of refurbishment prohibitive, the Unite Federation approached Apex Office Interiors initially with the brief to space plan and put budgets to the fitout of potential new premises. As the requirement gathered momentum, new premises were selected and a full specification drawn up for their refit.
Scope of works
  • Electrical works
  • Data cabling
  • Partitioning
  • New furniture
  • Building works
  • Flooring
  • Plumbing
  • Kitchen installation
  • New platform lift
  • Audiovisual installation
  • Move Management 
"Apex provided a complete service from conception of the basic idea to the finished furnished product. The flexible and responsive approach allowed us to introduce changes to ensure that our original ideas better suited our needs, which has meant that we have created the best possible environment for our team.”
Malcolm Booth, Assistant General Secretary/Treasurer
Project facts:
  • Client:Lorne Stewart
  • Location:Harrow
  • Size of Project:4600ft2
  • Budget:£130,000
In November 2007 Apex was awarded the contract to undertake the full refurbishment  of the entrance, main reception, break out areas and adjoining meeting rooms and offices of Lorne Stewart's offices in Harrow.  The contract was carried out in two stages and during the first phase Apex was also instructed to supply and install a bespoke reception desk and executive meeting room furniture and seating.
Scope of works
  •  Full height glass entrance doors
  • Glazed and solid partitioning
  • Suspended ceilings
  • Recessed and feature lighting
  • Hard and soft flooring
  • Electrical & data installation
  • Corniche boardroom table
  • Ocean meeting chairs
  • Space Planning
Project facts:
  • Client:Liebherr
  • Location:Biggleswade
  • Size of Project:9600ft2
  • Budget:£165,000
In May 2007, Apex was awarded the contract to refurbish the second & first floors of Liebherr GB's head office in Biggleswade. The project involved phased works to accomodate existing staff who were relocating to different areas within the building, and had to be carried out over 12 weeks, with each area being treated as separate phase. The project was completed on time and with a minimum of disruption to Liebherr staff.
Scope of works
  • Electrical installation
  • Data installation
  • Building works
  • Partitioning
  • Ceiling alterations
  • Space Planning
  • Racking
  • Move Management
  • Air Conditioning
Project facts:
  • Client:Leisure Finance MK
  • Location:Milton Keynes
  • Size of Project:5300ft2
  • Budget:£125,000
A long standing customer of Apex, Leisure Finance approached Apex with the brief to create a stunning working environment in their new offices in Milton Keynes. The design and planning stages were of great importance with this project. After product selection and layouts were agreed, the installation was carried out on time and on budget with the end result being a delighted customer.
Scope of works
  • Boardroom Furniture & seating
  • General office furniture & seating
  • Reception desk & seating
  • Partitioning
  • Storagewall
  • Electrical installation
  • Data installation
  • Teapoint
  • Fire detection
  • Soft flooring
  • Security Grilles
  • Decorations
  • Audiovisual installation
"We would recommend without hesitation Apex Office Interiors Ltd as a most suitable partner for all aspects of office refurbishment"
Bill Young, Operations Director Leisure Finance
Project facts:
  • Client:Henry Winterman
  • Location:Elstree
  • Size of Project:3450ft2
  • Budget:£100,000
Fit-out of 2 storey building in Elstree.  Apex designed an attractive office layout to the ground floor and a 60 person conference centre including all AV requirements, electrical and data works and office furniture. 
Scope of works
  • Office Furniture
  • Partitioning
  • Electrical & data works
  • Hard & soft flooring
  • AV Installation
Project facts:
  • Client:Freedom Communications
  • Location:Watford
  • Size of Project:1100ft2
  • Budget:£100,000
Strip out existing  and design and build new, contemporary, Demonstration and Boardrooms for this forward thinking communications company.  Design was key in this project as the customer wished to portray a cutting edge, contemporary image in keeping with their position at the forefront of their competetive market.
 
The finished installation exceeded the client's expectations in terms of design and functionality.
Scope of works
  • Curved and straight partitions
  • Curved and straight bulkheads
  • Design of feature and standard lighting
  • Design of small power installation
  • Design of audiovisual and data integration
  • Recessed plasma screens and monitors
  • Bespoke joinery
  • Bespoke metalwork
Freedom are a technology based company and need to be able to prove they are at the forefront of developments. Our newly redesigned boardrooms and demo rooms were completed quickly and with very little stress to us as a company. We would definitely recommend Apex because of their attention to detail and excellent contemporary finish.
Pat Botting Managing Director
Project facts:
  • Client:Firstan
  • Budget:£240,000
Apex was awarded the contract to fitout Firstan's flagship head office in October 2009.  After consultation with the client an 8 week programme was agreed and work commenced immediately after gaining design approval from Building Control.
Scope of works
  • Design and space planning
  • Mezzanine design and installation
  • Jumbo wall
  • Partitioning
  • Suspended ceilings
  • Electrical installation
  • Data installation
  • M & E works
  • Teapoints
  • Hard and soft flooring
  • Decorations
  • Office Furniture
  • Reception furniture
  • Executive furniture
  • Soft seating
  • Cafe and breakout furniture
  • Local authority approvals
  • CDM co-ordination
“When Firstan decided to relocate their entire operation from Bar Hill to Godmanchester one of the main concerns was the need to appoint a contractor to carry out the work who understood not only the physical needs of our office environment but were able to be flexible enough to deal with the need to keep production going in a number of sensitive areas. At all points of this move not only have Apex managed to deal with everything we threw at them but overall they have exceeded our expectations and produced a superb office environment During previous works with other contractors the day to day dealings had proved very demanding; however with Apex the whole process was managed in such a way as to make the move stress free. We would have no hesitation in recommending Apex as a partner in either relocation, fit out or any aspect of the commercial office environment”
Paul Hartwig, Production Director Firstan Ltd
Project facts:
  • Client:Easters Head Office
  • Location:Luton
  • Size of Project:4000ft2
  • Budget:£70,000
In January 2008 the prestige commercial developers Easter Developments chose Apex to carry out the subdivision of the Butterfield Development on the A505 between Luton and Hitchin. As clients started to populate the various units, Apex secured the contracts to fitout and supply office furniture to various end users, amongst whom David Reid Homes, Lambert Smith Hampton, Play V and Instant Business.
 
Scope of works
  • Solid partitioning
  • Glazed partitioning
  • Office furniture
  • Electrical installation
  • Data installation
  • Kitchen installation
  • Decorating
  • Building works
  • Hard & soft flooring installation
Apex Office interiors delivered an excellent service on time and I would not hesitate to recommend them
Stuart Pearson
Project facts:
  • Client:Barrett Webb
  • Location:St Albans
  • Size of Project:2500ft2
  • Budget:£92,500
Refurbishment of two floors in a Grade 2 listed building in historic St Albans. This project was carried out over 8 weeks whilst the client was in situ, and was completed on time, to budget and with little or no inconvenience to Barrett Webb.
Scope of works
  • Progressive strip out
  • Complete re-wire
  • Task and feature lighting
  • Network cabling
  • Comfort cooling to all areas
  • Suspended ceilings
  • Internal partitioning
  • Glass and stud partitioning 
  • Contemporary tea point
  • Hard and soft flooring 
  • Complete re-decoration
  • External blinds