Education Case Studies

Education Case Studies

APEX Education Case Studies

Luton Sixth Form College

Specialised expert refurbishment of Science Laboratory involving heating and ventilation works.
CLIENT:Luton Sixth Form College
LOCATION: North Luton
SIZE OF PROJECT: 2 Science Rooms
BUDGET: £71,000

Open PDF
Royal Latin School

Redesigned and updated washroom facilities.
CLIENT:RLS
LOCATION: Buckingham
SIZE OF PROJECT:Washroom
BUDGET: £30,000

Open PDF
Marlborough Science Academy

Design, refurbishment and supply of contemporary furniture in stunning new staff areas.
CLIENT: The Marlborough Science Academy.
LOCATION: St Albans
SIZE OF PROJECT: 125m2
BUDGET: £35,000

Open PDF
Townsend School

Modernisation of swimming pool changing rooms, creating wonderful shower and washroom facilities.
CLIENT: Townsend School is a secondary school with an intake of 150 children each year.
LOCATION: St Albans
SIZE OF PROJECT: Swimming pool changing rooms and sports hall changing rooms
BUDGET: £125,000

Open PDF
Barnfield College

Stylish refurbishment of office areas to include a tea point and modern partitioning.
CLIENT: Barnfield College, a pioneering federation encompassing schools and further education facilities
LOCATION: Apex refurbished an element of their office space for the principals and their team
SIZE OF PROJECT: 3200ft2
BUDGET: £85,000

Open PDF
Hitchin Girls’ School

Overhaul and redesign of PE department changing rooms and school toilets
CLIENT: Hitchin Girls’ School, a 1000 strong secondary school, awarded “outstanding” by Ofsted in 2013
LOCATION: Hitchin
SIZE OF PROJECT: Changing rooms and school toilets
BUDGET: £70,000

Open PDF
Luton Sixth Form College Canteen, Café and admin areas

Specialised rework of servery facility and installation of admin offices.
CLIENT: Luton Sixth Form College
LOCATION: Northern Luton
SIZE OF PROJECT: Canteen/café area and admin areas
BUDGET: £51,000

Open PDF